Real Estate Isla Mujeres

NEW REAL ESTATE DEVELOPMENTS

Sierra Mar Condos

Construction complete! Final units ready to take possession.

Sierra Mar – New Luxury Condos on Isla Mujeres

Sierra Mar is the newest condo development on Isla Mujeres, located mid-island on the Caribbean Ocean side. This boutique project brings a high level of design and construction quality to one of the island’s most desirable areas—and it’s now fully completed and ready for delivery.

Only 3 units remain available. Seven of the ten exclusive residences have already sold, and the final units include:

  • Two fully furnished 3-bedroom units, ready to occupy or rent immediately – $780,000 USD and $805,000 USD

  • One 4-bedroom penthouse, delivered as a blank canvas – $1,480,000 USD

All common areas are finished to impeccable standards, including high-end outdoor furniture and landscaping. Rental operations are in place, allowing new owners to begin generating income without delay.

Design & Features

Each of the 10 units was built with quality and comfort in mind, offering spacious open-concept layouts and stunning ocean views from every residence. Interior highlights include:

  • Mexican marble floors and Quartz countertops

  • Premium Teka kitchen appliances, including a drawer dishwasher

  • European-style kitchen cabinets and customized closets

  • Travertine marble bathrooms with vessel sinks

  • Reinforced glass windows

  • Private pool access

  • Elevator for easy access to all levels

These 3- and 4-bedroom condos range from 1,900 to 3,100 square feet, making them some of the most spacious homes available on the island.

Now is the time to secure your unit in this exceptional development. With construction complete and demand rising, these final units won’t be available for long.

For additional information please contact us at sales@mundaca.com.mx

Project Updates

April 29, 2025
February 19, 2025

3 units have now been delivered!  The rest are being finished as you read this.   The common areas are now being finished as well as the elevator.  In a couple weeks the common areas will be done and they will start renting the units which have been sold.  The furniture for the common areas was just delivered and the developers have selected a very high end brand for the common area furniture that should mean they will last for a long time to come and look amazing.   Right down the end the developers are not cutting corners!  This is definitely the finest quality build we’ve seen on the island.

Last chances to get introduction prices.  Each 2 units that are sold the developers are raising prices.   Don’t miss out on this chance!

December 15, 2024

We are so close to the end of this project!  Kitchens are going into all the units, the landscaping is complete.  The electric commission had a delay in installing the full electric connection which caused a few delays but the elevator is scheduled to be installed beginning of January and the developers are now projected the end of January to be able to deliver all units.  From now until Jan 1 the developers are offering the reserve units for just a $25k downpayment until you they are ready to give you possession of your unit.  This also locks you in for pre-construction prices with just a small initial payment.  Don’t miss out on this chance!

October 14, 2024

This project continues to move along at a great pace. The pergola has been added, some landscaping is going in, the pool area continues to get better and better. Most of the windows/doors have been installed florring has been completed throughout the building. A great deal of attention will no go in to the interior of the units with the ACs being installed and then ceilings will be completed. The developers are still projecting a mid December delivery (barring any further hurricanes or other unavoidable delays). Grab your unit now before the building is completed and prices go up!

September 28, 2024

This project continues to move along at a great pace. The pergola has been added, some landscaping is going in, the pool area continues to get better and better. Most of the windows/doors have been installed florring has been completed throughout the building. A great deal of attention will no go in to the interior of the units with the ACs being installed and then ceilings will be completed. The developers are still projecting a mid December delivery (barring any further hurricanes or other unavoidable delays). Grab your unit now before the building is completed and prices go up!

June 5, 2024

The model unit is ready for you to come see. The developers have worked with the most exclusive furniture and design store in Cancun to develop a package the can be bought for your unit or you can work with them to do a custom design from their multiple stores in Cancun. The unit shows you the attention to detail they are putting in to these units and how beautiful yours could be!

April 20, 2024

The pool has been poured, the forms are off and we are VERY excited about how amazing this pool will be.  20M/66Ft long it will be amazing and being built raised off the ground your views will be unobstructed to the water.  Float in the pool and all you’ll see is SEA.  The conduit and wiring has been installed under the sidewalk along the road.  The are just waiting for the electric commission to switch the power to those lines and remove the existing power lines.   They are sparing no expense to make sure you have a perfect view from your new condo!  They are up to the 3rd floor now installing flooring.  They and moving along very quickly with the goal to have the owners in by Christmas.   Let us know right away if you are interested in a unit!  Documents above have availability, pricing, Income/Expense (ROI) projections a unit plans and renders.

March 16, 2024

The developers of this complex are doing an amazing job with progress.  In this batch of photos you’ll see how they are moving very quickly.  We have photos of the model unit that have created on the ground floor for people to get a good sense of the finishings they will be using.  The pool is progressing very well as is the exterior.  They have gotten flooring in on the ground floor units and are working on the second floor.  All in all we feel they are doing a fantastic job with attention to detail, materials and overall project quality and speed.

January 6, 2024

What a great way to welcome in 2024.  The rooftop was poured last weekend as I was taking these photos.  The overall structure of the building is now complete and work has already begun on the ground floor and second floor installing flooring, drop ceilings and HVAC/plumbing/electric.  This project has advanced at a great pace and we anticipate keeping up the pace into 2024.  The developers are promising to deliver before the end of the year so that would be a fantastic Christmas present for this coming year, but get it now!

November 26, 2023

One month later and we’ve made it to the starting the walls of the penthouse units.  This project is advancing quickly!

October 22, 2023

This project is going up quickly. They are currently working on the 3rd floor andSave have started finishings in one of the ground floor units to use as a model. Hopefully we will have them all sold out before that is done! Project is scheduled to finish in December of 2024 but the developers are dropping hints they might be done before. That would be a record on Isla for a condo project to be delivered ahead of time.

September 15, 2023

September update…..  The second floor is about half way completed and work continues at a great pace!

Kaa’x Tulum

Introducing Mundaca Tulum’s Newest offering
Kaa’x Tulum is an amazing, high end, wholistic community. Here you will find:

•Holistic center & SPA
• Beach club
• Concierge services
•Transportation
•24/7 security
•Parking

K’AAX uses natural light to showcase the beautiful materials
throughout. The timeless essence of our architecture and attention to
detail for your enjoyment is our main priority and focus, driven by our
goal of creating a “natural living environment” for you!

From 1 bedroom garden suites starting at $209,000 to 3 bedroom villas with starting at $385,000, there is something for everyone. This unique complex is under construction now with an estimated completion date of April 2025.

Don’t miss out on this one of a kind opportunity.

Real Estate Isla Mujeres
Real Estate Isla Mujeres

OWNING PROPERTY IN MEXICO

Buyers Guide

There are two ways for foreigners to purchase property in Mexico. Click on the buttons below for description of the process. This should not be taken as legal advice. It is important to have help making the right buying decision for you.

At Mundaca Real Estate we can assist our buyers with referrals to experienced attorneys and notaries to make your buying experience as simple as possible.

Real Estate Isla Mujeres
Real Estate Isla Mujeres

BEAUTIFUL PROPERTIES FOR SALE IN ISLA MUJERES AND RIVIERA MAYA MEXICO.

Real Estate Isla Mujeres